Load Impact Estimation for Demand Response: Protocols and Regulatory Guidance
- Details
- Created on Tuesday, 01 April 2008 00:00
California’s Energy Action Plan (EAP II) emphasizes the need for demand response resources (DR) that result in cost-effective savings and the creation of standardized measurement and evaluation mechanisms to ensure verifiable savings. California Public Utilities Commission (CPUC) Decision D.05-11-009 identified a need to develop measurement and evaluation protocols and cost-effectiveness tests for demand response (DR). On January 25, 2007, the Commission opened a rulemaking proceeding (OIR 07-01-041), with several objectives, including:
- Establishing a comprehensive set of protocols for estimating the load impacts of DR resources;
- Establishing methodologies to determine the cost-effectiveness of DR resources.